HomeSolutionsDefence FloorsWS-100 Project Review HMAS Darwin Galley Repairs

WS-100 Project Review

HMAS Darwin Galley Repairs

An area around a steel bench in the galley that had the previous flooring removed. An area around a steel bench in the galley with the WS-100 system restored. A close up of the edge of the flooring repairs showing the transition from new floor to old.

Project Summary

Client           Royal Australian Navy
Location Sydney, New South Wales
Colour Light Grey (N35)
Area Unknown
Installer Defence Floors

Comments

  • With corrosion suspected inside the vessel foundations, various sections of the steel deck were cut out for repairs, including some of the wet-space flooring system installed in the galley. After the works were completed, the Jaxxon products were applied once again to restore the original floor and ensure moisture was unable to migrate through the cut interface.

  • A couple of notable observations were made during application. Firstly, as is often the case during installation, water was dripping onto the freshly applied product from two leaky valves. If the Jaxxon products weren’t moisture tolerant this would’ve caused delays to the project. Secondly, the floor patch was installed while further hot works were being performed in surrounding areas of the ship. The solventless nature of Jaxxon products meant there were no flammability concerns and, once again, delays were avoided.


Download Case History


Want to know more about resin flooring?

Get our 20-page resin flooring guide for specifiers and floor owners here

Free Download Free Download